Appendix D
Master List for Installation Pictures


Roll 1
Label Meter Location Date Description
R1-P1 HK-10 6/13/2000 Cabinet Before Installation
R1-P2 HK-10 6/13/2000 Meter Pit
R1-P3 HK-10 6/13/2000 Cabinet After Installation
R1-P4 HK-10 6/13/2000 Close-up of Connecitons After Installation
R1-P5 WN-7 6/13/2000 Cabinet Before Installation
R1-P6 WN-7 6/13/2000 Meter Pit Looking North
R1-P7 WN-7 6/13/2000 Meter Pit -- Small Venturi 
R1-P8 WN-7 6/13/2000 Cabinet After Installation 
R1-P9 WN-7 6/13/2000 Close-up: data-logger
R1-P10 WN-7 6/13/2000 Close-up: Isolator
R1-P11 WN-7 6/13/2000 Close-up of Connections After Installation
R1-P12 RD-9  6/14/2000  Cabinet w/ Existing Data-logger (Hart Protocol)
R1-P13 RD-9 6/14/2000 Meter Pit
R1-P14 EC-1 6/14/2000  Cabinet Before Installation
R1-P15 EC-1 6/14/2000 Close-up of Connections Before Installation
R1-P16 EC-1 6/14/2000 Meter Pit From West looking East
R1-P17 EC-1 6/14/2000  Meter Pit From East looking West
R1-P18 EC-1 6/14/2000 Close-up of Connections After Installation -- DO NOT USE
R1-P19 EC-1 6/14/2000  Close-up of Connections After Installation
R1-P20 EC-1 6/14/2000 Cabinet After Installation
R1-P21 RR-2 6/15/2000 Meter Pit -- Venturi
R1-P22 RR-2 6/15/2000 Meter Pit: DP Cells
R1-P23 RR-2 6/15/2000 Cabinet After Installation
R1-P24 RR-2 6/15/2000 Close-up of Connections After Installation

Roll 2
Label Meter Location Date Description
R2-P1 TA-6 6/15/2000 Meter Pit: From South Looking North
R2-P2 TA-6 6/15/2000 Meter Pit: From North Looking South
R2-P3 GI-3 6/16/2000 Outside of Meter Building
R2-P4 GI-3 6/16/2000 Close-up of Chart Area Before Installation
R2-P5 GI-3 6/16/2000 Close-up of Connections Before Installation
R2-P6 GI-3 6/16/2000 Venturi and DP Cell (in basement)
R2-P7 GI-3 6/16/2000 Close-up of Connections After Installation
R2-P8 GI-3 6/16/2000 Overall System After Installation
R2-P9 VB-3 6/16/2000 Cabinet Before Installation
R2-P10 VB-3 6/16/2000 Close-up of Connections Before Installation
R2-P11 VB-3 6/16/2000 Meter Pit -- Venturi
R2-P12 VB-3 6/16/2000 Meter Pit: DP Cells
R2-P13 VB-3 6/16/2000 Close-up of Connections After Installation
R2-P14 VB-3 6/16/2000 Cabinet After Installation
R2-P15 NE-4 6/19/2000 Cabinet Before Installation
R2-P16 NE-4 6/19/2000 Close-up of Connections Before Installation
R2-P17 AH-3 6/19/2000 Cabinet Before Installation
R2-P18 AH-3 6/19/2000 Close-up of Connections Before Installation
R2-P19 AH-3 6/19/2000 Meter Pit: From South Looking North
R2-P20 AH-3 6/19/2000 Meter Pit: Venturi
R2-P21 AH-3 6/19/2000 Meter Pit: Orifice and Valve Close-up
R2-P22 AH-3 6/19/2000 Close-up of Connections After Installation
R2-P23 AH-3 6/19/2000 Cabinet After Installation
R2-P24 AH-3 6/19/2000 Hard at Work
R2-P25 AH-3 6/19/2000 General Area After Installation

Roll 3 - Note: R3 Used the "SNAPPY" CAMERA
Label Meter Location Date Description
R3-P1 NE-4 6/19/2000 Meter Pit: From South
R3-P2 NE-4 6/19/2000 Meter Pit: Venturi and DP Cell
R3-P3 NE-4 6/19/2000  Close-up of Connections After Installation
R3-P4 NE-4 6/19/2000 Cabinet After Installation
R3-P5 WG-2 6/19/2000 Cabinet Before Installation
R3-P6 WG-2 6/19/2000 Close-up of Connections Before Installation
R3-P7 WG-2 6/19/2000 Close-up of Connections After Installation
R3-P8 WG-2 6/19/2000 Cabinet After Installation
R3-P9 CT-4 6/20/2000 Cabinet Before Installation
R3-P10 HR-1 6/20/2000 Cabinet w/ Exisiting Data-logger
R3-P11 CT-4 6/20/2000 Close-up of Connections After Installation
R3-P12 CT-4 6/20/2000 Cabinet After Installation
R3-P13 CH-1 6/20/2000 Cabinet Before Installation
R3-P14 CH-1 6/20/2000  Meter Pit
R3-P15 CH-1 6/20/2000 Meter Pit: Venturi and DP Cell 
R3-P16 CH-1 6/20/2000 Cabinet After Installation
R3-P17 CH-1 6/20/2000 Close-up of Connections After Installation
R3-P18 OP-2 6/21/2000 Meter Pit
R3-P19 OP-2 6/21/2000  Meter Pit: Venturi and DP Cell
R3-P20 OP-2 6/21/2000 Cabinet After Installation
R3-P21 OP-2 6/21/2000 Close-up of Connections After Installation
R3-P22 GK-3 6/21/2000 Meter Pit
R3-P23 GK-3 6/21/2000 Meter Pit
R3-P24 GK-3 6/21/2000 Cabinet Before Installation

Roll 4
Label Meter Location Date Description
R4-P1 PO-1 6/21/2000 Cabinet Before Installation
R4-P2 PO-1 6/21/2000 Close-up of Connections Before Installation
R4-P3 PO-1 6/21/2000 Cabinet After Installation
R4-P4 PO-1 6/21/2000 Close-up of Connections After Installation
R4-P5 RC-2 6/21/2000 Cabinet Before Installation
R4-P6 RC-2 6/21/2000 Cabinet After Installation
R4-P7 HK-10 6/22/2000 Cabinet Before Installation
R4-P8 HK-10 6/22/2000 Close-up of Connections Before Installations
R4-P9 HK-10 6/22/2000 Cabinet After Installation
R4-P10 HK-10 6/22/2000 Close-up of Connections After Installation
R4-P11 TA-6 6/22/2000 Cabinet Before Installation
R4-P12 TA-6 6/22/2000 Close-up of Connections Before Installation
R4-P13 TA-6 6/22/2000 Close-up of Connections After Installation
R4-P14 TA-6 6/22/2000 Cabinet After Installation
R4-P15 YT-1 6/22/2000 Cabinet Before Installation
R4-P16 YT-1 6/22/2000 Close-up of Connections Before Installation
R4-P17 YT-1 6/22/2000 Meter Pit: PRV from N.
R4-P18 YT-1 6/22/2000 Meter Pit: Meter and Valve from South
R4-P19 YT-1 6/22/2000 Meter Pit: Venturi and DP Cell
R4-P20 YT-1 6/22/2000 Cabinet After Installation
R4-P21 NE-5 6/22/2000 Close-up of Connections After Installation
R4-P22 NE-5 6/23/2000 Cabinet Before Installation
R4-P23 NE-5 6/23/2000 Close-up of Connections Before Installation
R4-P24 NE-5 6/23/2000 Circuit Box Close-up
R4-P25 NE-5 6/23/2000 Meter Pit From Above

Roll 5
Label Meter Location Date Description
R5-P1 NE-5 6/23/2000 Meter Pit From North
R5-P2 NE-5 6/23/2000 Meter Pit: DP Cells
R5-P3 NE-5 6/23/2000 Meter Pit: Venturi
R5-P4 NE-5 6/23/2000 Cabinet After Installation
R5-P5 NE-5 6/23/2000 Close-up of Connections After Installation
R5-P6      
R5-P7 Not Project picutres  
R5-P8      
R5-P9 LA-2 6/26/2000 Site Upon Arrival
R5-P10 LA-2 6/26/2000 Cabinet Before Installation
R5-P11 LA-2 6/26/2000 Close-up of Connections Before Installation
R5-P12 LA-2 6/26/2000 Meter Pit: Venturi
R5-P13 LA-2 6/26/2000 Meter Pit from North
R5-P14 LA-2 6/26/2000 Meter Pit: Venturi and DP Cells
R5-P15 LA-2 6/26/2000 Close-up Connections After Installation
R5-P16 LA-2 6/26/2000 Cabinet After Installation
R5-P17 SN-1 6/26/2000 Site View
R5-P18 SN-1 6/26/2000 Cabinet Before Installation
R5-P19 SN-1 6/26/2000 Close-up Connections Before Installation
R5-P20 SN-1 6/26/2000 Meter Pit from North
R5-P21 SN-1 6/26/2000 Meter Pit: Venturi
R5-P22 SN-1 6/26/2000 Meter Pit: Venturi and DP Cells
R5-P23 SN-1 6/26/2000 Meter Pit: Orifice Mechanism and DP Cell
R5-P24 SN-1 6/26/2000 Close-up Connections After Installation
R5-P25 SN-1 6/26/2000 Cabinet After Installation

Roll 6 - Note: Taken with "SNAPPY" CAMERA
Label Meter Location Date Description
R6-P1 AH-3 6/23/2000 Overall Site upon arrival
R6-P2 AH-3 6/23/2000  Cabinet After Calibration 
R6-P3 OT-1 6/23/2000  Overall Site upon arrival
R6-P4 OT-1 6/23/2000  Meter Pit From North
R6-P5 OT-1 6/23/2000  Meter Pit: DP Cells
R6-P6 OT-1 6/23/2000  Meter Pit: Pressure Monitoring Setup
R6-P7 OT-1 6/23/2000 Meter Pit: Closeup of String going into Conduit
R6-P8 OT-1 6/23/2000 Close-up of Connections After Installation
R6-P9 FL-1 6/23/2000  Cabinet After Installation
R6-P10 FL-1 6/23/2000 Meter Pit: 60" Venturi on Left
R6-P11 FL-1 6/23/2000 Meter Pit: 30" Venturi on Right
R6-P12 FL-1 6/23/2000 Meter Pit: Pressure Connections
R6-P13 FL-1 6/23/2000 Meter Pit: DP Cells
R6-P14 FL-1 6/23/2000 Cabinet After Installation
R6-P15 FL-1 6/23/2000 Site Picture showing broken board
R6-P16 NH-1 8/11/2000  Meter Pit: General
R6-P17 NH-1 8/11/2000 Meter Pit: Closeup of Large Venturi
R6-P18 NH-1 8/11/2000 Meter Pit: Closeup of Small Venturi (Orifice?)
R6-P19 NH-1 8/11/2000 Pit Closeup of DP Cells
R6-P20 NH-1 8/11/2000 Closeup of High Slide Connections
R6-P21 NH-1 8/11/2000 Closeup of Overall Wiring Scheme
R6-P22 NH-1 8/11/2000 Whole Cabinet
R6-P23      
R6-P24      

Roll 7 - Note: Taken with Disposable Camera
Label Meter Location Date Description
R7-P25 SS-3 6/27/2000 Cabinet After Installation
R7-P24 SS-3 6/27/2000 Site Area After Installation
R7-P23 SS-3 6/27/2000 Close-up of Connections After Installation
R7-P22 WO-2 7/20/2000 Cabinet Before Installation
R7-P21 WO-2 7/20/2000 Close-up of Connections Before Installation
R7-P20 WO-2 7/20/2000 Meter Pit: Meter Heads Before Installation
R7-P19 WO-2 7/20/2000 Meter Pit: Meter Heads After Installation
R7-P18 WO-2 7/20/2000 Cabinet After Installation
R7-P17 VB-4 7/20/2000 Meter Pit: Meter Heads Before Installation
R7-P16 VB-4 7/20/2000 Meter Pit: Whole Pit Before Installation
R7-P15 VB-4 7/20/2000 Meter Pit: Closeup of Lowside Head Before (Cracked)
R7-P14 VB-4 7/20/2000 Meter Pit: Meter Heads After Installation
R7-P13 VB-4 7/20/2000 Meter Pit: Whole Pit After Installation
R7-P12 LA-3 7/21/2000 Cabinet Before Installation
R7-P11 LA-3 7/21/2000 Meter Pit: Meter Heads Before Installation
R7-P10 LA-3 7/21/2000 Meter Pit: Whole Pit Before Installation
R7-P9 LA-3 7/21/2000 Meter Pit: Conduit with String Before Installation
R7-P8 LA-3 7/21/2000 Meter Pit: Meter Heads After Installation
R7-P7 LA-3 7/21/2000 Meter Pit: Whole Pit After Installation
R7-P6 LA-3 7/21/2000 Meter Pit: Conduit with String After Installation
R7-P5 LA-3 7/21/2000 Cabinet After Installation
R7-P4 GK-3 7/21/2000 Cabinet Before Installation
R7-P3 GK-3 7/21/2000 Meter Pit: Meter Heads Before Installation
R7-P2 GK-3 7/21/2000 Meter Pit: Whole Pit Before Installation
R7-P1 GK-3 7/21/2000 Meter Pit: Meter Heads After Installation
R7-P00a GK-3 7/21/2000 Meter Pit: Close-up of Connections After Installation
R7-P00 GK-3 7/21/2000 Cabinet After Installation

Roll 8
Label Meter Location Date Description
R8-P1 WB-2 6/27/2000 Cabinet Before Installation
R8-P2 WB-2 6/27/2000 Close-up of Connections Before Installation 
R8-P3 WB-2 6/27/2000 Meter Pit: From South (PRVs)
R8-P4 WB-2 6/27/2000 Meter Pit: DP Cells and Venturi
R8-P5 WB-2 6/27/2000 Meter Pit: DP Cells and Orifice Mechanism
R8-P6 WB-2 6/27/2000 Close-up of Connections After Installation
R8-P7 WB-2 6/27/2000 Cabinet After Installation
R8-P8 LV-15 6/27/2000 Cabinet Before Installation
R8-P9 LV-15 6/27/2000 Close-up of Connections Before Installation
R8-P10 LV-15 6/27/2000 Meter Pit from Above
R8-P11 LV-15 6/27/2000 Cabinet After Installation
R8-P12 LV-15 6/27/2000 Close-up of Connections After Installation
R8-P13 WL-8 7/24/2000 Cabinet Before Installation
R8-P14 WL-8 7/24/2000 Meter Pit: Meter Heads Before Installation
R8-P15 WL-8 7/24/2000 Meter Pit: Whole Pit Before Installation
R8-P16 WL-8 7/24/2000 Meter Pit: Meter Heads After Installation
R8-P17 WL-8 7/24/2000 Meter Pit: Whole Pit After Installation
R8-P18 WL-8 7/24/2000 Cabinet After Installation
R8-P19 RK-1 7/24/2000 Cabinet Before Installation
R8-P20 RK-1 7/24/2000 Meter Pit: Meter Heads Before Installation 
R8-P21 RK-1 7/24/2000 Meter Pit: Whole Pit Before Installation
R8-P22 RK-1 7/24/2000 Meter Pit: Meter Heads After Installation
R8-P23 RK-1 7/24/2000 Cabinet After Installation
R8-P24 WL-8 7/25/2000 Cabinet Before Hasp and Lock Installed
R8-P25 VB-4 7/26/2000 Cabinet Before Hasp and Lock Installed

Roll 9 - Note taken with Nikon
Label Meter Location Date Description
R9-P1 RK-1 7/26/2000 Cabinet Before Hasp and Lock Installed
R9-P2 RK-1 7/26/2000 Cabinet After Hasp and Lock Installed
R9-P3 WL-8 7/26/2000 Cabinet After Hasp and Lock Installed
R9-P4 RK-1 8/2/2000 Inside of Cabinet w/ Extension Cord
R9-P5 RK-1 8/2/2000 Outside of Cabinet With Door Closed
R9-P6 RK-1 8/2/2000 View of Extension Cord from Manhole to Cabinet

 

back to Task G: Temporary Flow Monitoring Appendix

 

Please direct your comments or questions regarding this site to the Public Affairs Division at (313) 964-9460 or e-mail us.
All content, artwork, and information included herein is ©2007 Detroit Water & Sewerage Department
Home, Customer Info, About DWSD, Announcements, Projects, Facilities, History, Procurement,
Links